Datacenter
Kingdom of Saudi Arabia
200MW Google-Dammam, Hyperscale Datacenter

Duration:
2020-2022
Mandate:
Prior to founding EBP, the firm's Managing Partner, Nasir, served as Senior Desing Engineer appointed by EPC contractor ACWA Power.
Key Stakeholder:
EBP Managing Partner, appointed by ACWA Power as Senior Design Engineer, led the conceptual design studies for a 200 MW AI hyperscale data center campus in Dammam, including FEED and detailed design for a scalable, high-density facility supporting advanced AI and GPU workloads.